Is the shuttle
running?
istheshuttlerunning.com

Schedule-to-demand planning

Turn workforce schedules into a transportation plan.

Is the Shuttle Running connects employee shift times to the shuttle operation so managers can see when people are arriving, leaving, and changing over during the day.

Direct answer

What is workforce transportation planning in Is the Shuttle Running?

Is the Shuttle Running uses employee work schedules as operational input for shuttle planning. Shift start and end times become expected transportation demand, giving managers a clearer view of morning arrivals, midday turnover, evening departures, and the coverage needed around each window.

From a schedule file to an operating day

Import the latest schedule

Upload workforce schedule data so planning reflects the people who are actually expected to work.

Translate shifts into demand

Is the Shuttle Running interprets employee start and end times as transportation demand rather than leaving managers to count rows manually.

Plan by operating window

Morning driving, midday turnover, and evening driving are treated as different operational problems instead of one generic shift.

Review changes safely

When a newer upload changes a work schedule, Is the Shuttle Running can surface the difference and recommend a response without erasing the old planning decision.

Planning for exceptions, not just the ideal day

Employee transportation changes when schedules are revised, operating calendars are incomplete, drivers call out, or the organization is open for a special event. Is the Shuttle Running is structured so those exceptions can be reviewed explicitly rather than hidden inside a spreadsheet.

  • Schedule-change reconciliation preserves the prior assignment and explains what changed.
  • Calendar verification and authorized overrides give managers a documented way to handle unusual operating days.
  • Planning dates can be reviewed historically instead of treating the dashboard as today-only.
  • Demand and driver coverage remain separate concepts, which makes gaps easier to identify.

Workforce transportation planning FAQs

How does Is the Shuttle Running calculate transportation demand?

Is the Shuttle Running uses employee shift timing to identify expected arrivals, departures, and midday movement. The goal is to show the operational demand created by the workforce schedule.

What happens if the schedule changes after it was already uploaded?

A newer upload can be reconciled against the existing plan. Is the Shuttle Running preserves the original decision, explains the change, and lets a manager accept a recommendation or keep the current assignment.

Can a manager plan for a special operating day?

Yes. Is the Shuttle Running supports documented calendar overrides so an authorized manager can confirm an operating day when an external calendar is unavailable or incorrect.

Build the shuttle plan from the schedule you already have.

Is the Shuttle Running is designed to fit around the workforce schedule rather than asking operations teams to re-create the same information in a second system.

Request a demo